What is AHU? Don't just judge by the coldness | HRT

Tác giả: Đoàn Văn Hoàng · Xem bài viết gốc tại doanvanhoang.com

What is AHU? Don't just judge by the coldness in the room

AHU stands for Air Handling Unit, meaning air handling equipment. In the HVAC system, the AHU receives, filters, exchanges heat and distributes air to the area of ​​use. The ability to dehumidify, mix outside air or perform other functions depends on the device configuration and system design. Trane

But understanding the name is just the starting point.

Imagine a situation: the office floor has reached the set temperature, the fan is still running, the air vent is still blowing. However, when the meeting room is crowded, users report that the space is cramped and uncomfortable. The operations team continues to reduce the temperature, but has not determined what is going on.

For me, this is the time to ask again: Are we testing cooling capacity, or are we fully assessing the air conditions in the room?

From the perspective of operating HRT, I want the selection and operation of AHU to start from that question. Investors need a space that meets usage requirements, not just confirmation that the equipment works.

The room's requirements must precede the specifications on the catalog

Before discussing an AHU model, I want to hear the user describe the work taking place inside the building.

One office floor can be used during office hours, but the meeting room is used after hours. A production area can change the number of people per shift. There are places where quiet is a priority; There are places that need to control humidity or air quality for technology.

These differences need to be included in the design problem. The selection of AHU must consider performance, heat load, air flow, ventilation requirements, installation conditions and control options, instead of inferring the configuration only from the floor area. HRT

I recommend that the initial discussion include the participation of the person directly exploiting the project. Engineers should not be left to guess which rooms are frequently crowded, which areas need continuous operation, or which parts can be paused for maintenance.

In the proposal, I need to see an explanation: What area does this AHU serve, what conditions must be maintained, and by what results will it be evaluated?

When the topic is unclear, comparing two devices solely based on capacity or purchase price will lack basis. Once the problem has been confirmed, the project team has a basis to choose the configuration and explain the accompanying conditions.

Understand AHU construction by following an air current

From the outside, an AHU is usually a cluster of equipment with a cover. To understand its value, you need to look at what happens to the air inside.

From the air intake to the filter

In a mixed configuration, the AHU receives outdoor air and some return air from the area of use. Air-adjustable louvers help control these two flows by design. After the treatment process, the air is returned to the building through the duct network. Trane

Outdoor wind plays a role in ventilation; The filter is responsible for retaining dust particles according to its filtration properties. These are two different missions. Air treatment needs to coordinate ventilation, filtration and adjustment of heat and humidity conditions, but cannot use one function to replace all the remaining functions. Daikin Internet

I would like the outside air requirement and the filtration requirement to be documented separately. When a proposal simply states “ensuring clean air,” the investor should ask for clarification on how the equipment will do that.

Filters must also be considered along with pressure loss. The pressure difference across the filter affects the fan's working requirements; The arrangement of the filter surface and the monitoring of differential pressure are important contents for operation. US EPA

Therefore, I do not want the filtration level to be raised by a single material replacement decision. The plan needs to be rechecked in the actual configuration, with air flow and response capabilities of the device.

Through the heat exchange coil and then to the place of use

In a system using a Chiller, cold water passes through the AHU coil to receive heat from the air. With the DX configuration, the coil exchanges heat directly with the refrigerant. AHU is therefore not synonymous with Chiller, nor does it automatically only use one type of cold source. Trane

This distinction has meaning right when planning. Records must clearly indicate the cooling source, working conditions and control coordination, instead of just stating the equipment name.

AHU configurations can be equipped with water valve, DX coil, damper and fan speed controls according to system requirements. These functions must be appropriate for the selected device, it cannot be assumed that all AHUs have the same capabilities. Daikin Internet

At this point, we can see that the AHU structure is not simply a list of components. It is the coordination between parts to create the necessary air state.

I want the design team to explain that combination: why this coil was chosen, why that air flow is needed, and how the system will react when usage needs change.

The temperature has been reached, why does the humidity still need to be checked?

This is the point I want investors to pay attention to when understanding the operating principles of AHU.

When the cold coil surface has a temperature lower than the dew point of the passing air, water vapor can condense on the coil. This process helps remove moisture from the air. However, the degree of dehumidification depends on actual working conditions, not just on whether fans and cold sources are operating. Trane

A system that controls primarily room temperature can reduce cooling capacity as the heat load decreases. In some configurations, this causes the coil surface to become warmer and moisture separation ability to decrease. The room still reaches the required temperature, but the humidity may no longer be maintained as desired. Trane

Reaching temperature is a result. Meeting moisture requirements is another result that needs to be confirmed.

Returning to the office floor situation at the beginning of the article, I would not ask the operations team to continue reducing the temperature as soon as there is a complaint of discomfort.

What needs to be done is to determine where, when and under what conditions of use the reflection appears. After that, the technical team compares the measurement results with the design requirements and finds the cause.

If humidity is a parameter that must be controlled, I would like to see the treatment plan and evaluation criteria right from the AHU selection file. You should not wait until the project is operational to start debating whether the requirement is within the scope of supply or not.

What I need from the design unit is not a general assertion that "the machine has enough capacity", but a basis to prove that the system meets the committed conditions.

Just because the fan is running doesn't mean every location is receiving enough wind

The air flow must also pass through the distribution network before reaching the user. Air leakage, pressure loss and pipe layout all affect operating results; they need to be controlled in design, installation and commissioning. Australian Energy

So I want the AHU evaluation to go beyond the computer room.

Suppose the office floor is initially designed to be open, then many meeting rooms and partitions are added. This is a change that needs to be reviewed by the HVAC team, rather than just updated on the interior drawings.

During the coordination session, I will ask the parties to place the current use plan next to the wind distribution drawing. Which positions have people working? Which areas change function? Are the existing vents and return ducts still suitable for the new space organization?

Conclusions need to be shown on drawings and verified on site.

For users, the parameters at the AHU output are not the whole answer. I would like the project team to confirm conditions in the area served, within the agreed scope and test scenarios.

Evaluate the system where the project needs results, not just where the equipment is located.

A suitable AHU must have a way to operate when the building has few people

When discussing configuration, I often add a hypothetical situation: business hours are over, there is only one room left to use. How will the system work?

This is a question to clarify the plan, not to assume that every project must split the equipment.

Using a central system overtime to serve only a small area can be wasteful. Zoning, operating schedules and traffic adjustments need to be considered along with actual operational needs. Australian Energy

I ask the planner to describe how the system serves different situations, rather than just showing how all areas work together.

For buildings with automatic controls, it is necessary to clarify which signals are used, which devices are regulated, and what can be monitored by the operator. AHUs can integrate temperature, humidity, CO₂ sensors and control fans, valves or dampers, but the actual range depends on the configuration provided. Daikin Internet

I don't want the description to stop at the words "with BMS connection". What needs to be discussed is which situations the building management system will help the operations team recognize and handle.

Once control functionality has been agreed upon, the commissioning plan needs a way to validate that functionality. The person taking over must understand what the system is doing, instead of just seeing the on or off status on the screen.

The cost of an AHU does not end at the date of purchase

In an investment plan, the equipment price is an easily visible amount. Operation and maintenance work then needs to be clarified in another way.

The energy associated with an AHU goes beyond just the fan. The way the device is operated also affects the processing needs of related systems, such as the Chiller. Therefore, evaluating efficiency needs to be considered within the system instead of just looking at the electrical capacity of one part. Australian Energy

I want when comparing options, the developer explains the same conditions of use. Do not place an option that fully meets the requirements next to an option that has reduced scope, and then draw conclusions from the price difference.

Maintenance work must also be visualized right on the installation site.

Try to put yourself in the position of the person who will change the filter in the future. From which side do they approach? Is there enough room to work? When you need to check the coil or condensate trough, do you have to remove other systems blocking the front?

Accessibility to filters, coils and condensate trays is an important aspect of design for operation and maintenance. US EPA

I recommend that all parties review the actual operation before finalizing the machine location. A maintenance space should be protected during construction coordination and should not become the remaining area after other systems have been installed.

When put into use, inspection also needs to go deeper than the superficial condition. Clean and properly installed filters, properly functioning dampers, cleaned coils, clean condensate troughs and good drainage are all things that need to be considered when inspecting an AHU. US EPA

To me, a complete investment plan must help the investor visualize both the handover date and the next maintenance times.

CEO Doan Van Hoang's perspective: Conclusion with actual usage conditions

When asked What is AHU?, investors often start from the desire to understand the equipment. I want the conversation to go further: understanding what the system needs to do to serve the project.

In the proposal, I need to see the usage requirements converted into selection grounds. On site, I need to see equipment coordinated with air lines, cold sources, controls and maintenance spaces. When I run a test, I need the results to accurately represent the tested range.

If a condition cannot be verified, state it clearly. If an area is not responding, identify what needs to be done and who is responsible for following up. The results of the completed section should not be used as a substitute for conclusions about the entire system.

I also wanted the operator to be involved in the onboarding process. They need to know which areas the system serves, which modes are confirmed, and where to find information when abnormalities appear.

That's how I view the responsibility of an HVAC unit: connecting the investor's requirements with the work of the technical team, then following up until the results can be verified.

An AHU should not be judged solely by whether the fan is running and the room is cool. What needs to be confirmed is whether the space meets usage requirements or not.

For projects that are being prepared for investment, start with the functions and exploitation conditions. With a system that is not operating satisfactorily, start from the data and current status before deciding to replace the device.

That's the spirit “Right from the beginning – Clear to the end – Sustainable green” that HRT pursues. HRT

CEO Doan Van Hoang | HRT
HRT – Green Breath for Every Project

Contact HRT to discuss AHU plans for the project: 0909.326.888.